Well, the hull sides are waxed 2x, once with a wheel with cleaner wax, once by hand with Colonites Fleetwax. Bottom is painted, shaft zincs installed.
Teak dash is in, all units are installed in it & all DC wiring for the units is complete. I need to complete antenna & tranducer connections, interfacing & Nmea connections.
All the spreader lights & underwater lights are completed, Circuit panels AC & DC are wired & live. Additional bilge pump is installed & high water alarm is completed.
I have some misc. B.S. to wrap upto ready her for the water, she'll be floating again by Tuesday or Wednesday. I'll then complete the rest...
Only one pic today, but its a good one!
Chris
Teak dash is in, all units are installed in it & all DC wiring for the units is complete. I need to complete antenna & tranducer connections, interfacing & Nmea connections.
All the spreader lights & underwater lights are completed, Circuit panels AC & DC are wired & live. Additional bilge pump is installed & high water alarm is completed.
I have some misc. B.S. to wrap upto ready her for the water, she'll be floating again by Tuesday or Wednesday. I'll then complete the rest...
Only one pic today, but its a good one!
Chris
Comment